Industry Profile “Heat-Power Industry of Russia in 2011-2016” – an information product within the framework of which specialists of “INFOLine” agency have prepared business-references on all the wholesale, territorial, regional generating companies, as well as a structured description of more than 100 investment projects on construction and reconstruction of thermal power plants which are actively realized at the moment. The current state, problems and prospects for further development of generating capacity of heat-power industry of Russia are analysed by the specialists of analytical agency “INFOLine”. Detailed information about WGC, TGC and regional companies (operational, financial and investment activities) is collected.
When structuring the investment projects, detailed information about its participants (contractors, designers, equipment suppliers, etc.) is collected. In the Appendix #1 the list of generating facilities is given, with the use of which the power supply under agreements for capacity supply (ACS), which in many respects defines the prospects of further development of thermal generation up to 2016, will be realized. In the Appendix #2 the recommendations about the generating capacities input at thermal power plants of Russia in 2010-2030 declared in the Master plan are provided.
The Industry Profile “Heat-Power Industry of Russia in 2011-2016” is prepared on the basis of information sources complex:
The official documents of the Government of Russia, the Department of Energy, the Ministry of Economic Development and Trade, the Energy Forecasting Agency, the Transmission System Operator, the Federal Tariff Service, such as:
Materials for the Government of the Russian Federation’s meetings concerning electric power;
The corrected Master plan of heat-power industry facilities placement up to 2020 with prospect up to 2030;
Energy Strategy of Russia for the period up to 2030;
Forecast of Economic Development of Russia for 2012-2014, developed by MEDT;
Scheme and programme of development of the UES of Russia for 2011-2017;
The project of Development strategy of power engineering industry for 2010-2020.
Reports, interview and presentations of Department of Energy of Russia’s representatives;
Proper materials of WGC, TGC and regional companies, including press releases, web-site materials, annual and quarterly reports, investment and purchasing programs;
Materials of foreign and Russian expert and analytical centers, investment companies, etc.;
Materials of mass media (printed press, electronic media, federal and regional news agencies);
Statistical data from official sources for 1991-2010, published at the moment of the research completion.
Profile Contains 2 Current state of Heat-Power Industry of Russia
8 1.1 GDP and power consumption in Russia 8 1.2 Energy efficiency of economy of Russia and the largest world countries
10 1.3 Structure of production of electric power in Russia
11 1.4 Wearing of the equipment of electric power plants
12 1.5 Prospects of power industry in Russia
16 1.6 Role of the innovations in the development of power industry
28 1.7 Main indicators of power industry in Russia
31 1.8 Cost of electric power in Russia and the developted world countries
35 Dynamics and forecast of electric power production and consumption
38 2.1 Dynamics and forecast of electric power production
38 2.2 Structure of power consumption on the IPS of Russia
40 Profile of significant events for electric power industry in 2011-2012 .
45 Consolidation of power assets of the generating companies
45 Modernization of capacities after the ACS performance
46 Governmentalization of the industry
47 Government influence on price forming processes
47 gas rates for industrial consumers and electric power plants
47 "Last mile" contracts
48 The Scheme and program of development of power industry of the Russian Federation subjects in 2011 . 48 Energy saving and increase of power efficiency for the period up to 2020 .
49 About radioactive waste management, modifications in legislation of the RF
49 Mass personnel "cleaning" in power industry
49 Prospects of the industry regulation
49 Activity of WGC, TGC and regional companies
51 3.1 Operating activities of the companies
51 3.2 Financial activity of the companies
56 3.3 Cornerstone investors of WGC and TGC
59 3.4 Investment programs of generating companies
61 "WGC-1”, JSC (INTER RJSC of UES, JSC)
68 Investment activity of JSC "WGC-1"
73 Structured description of investment projects JSC "WGC-1"
464 Structured description of investment projects JSC “Kamchatskenergo”
466 “Kamchatskenergo”, JSC: Kamchatsk CHPP-1, changeover of boiler units to popping of natural gas (reconstruction)
466 Investment activity of JSC "Far Eastern generating company"
467 “Far Eastern generating company”, JSC: Vladivostok CHPP-2, changeover of boiler units to popping of natural gas (reconstruction) 471 “Far Eastern generating company”, JSC: Construction of GTPP on the basis of Vladivostok CHPP-2 and CSWB (Central Steam-Water Boilerhouse)
473 “Far Eastern generating company”, JSC: Blagoveshchensk CHPP, coal block ¹4 (construction)
474 “Far Eastern generating company”, JSC: Sovgavansk CHPP, coal blocks ¹1, 2 (construction)
475 The Administration of Primorsk Region: Ussuriisk CHPP, coal power blocks ¹1,2 (construction)
477 Structured description of investment projects of other companies
478 The Government of Saint-Petersburg: the Yugo-Zapadny CHPP, combined cycle blocks ¹ 1, 2, gas-turbine block ¹3 (construction)
478 “Intertechelectro-New generation”, LLC: Kurgansk CHPP-2, combined cycle blocks ¹ 1, 2 (construction)
480 “EuroSibEnergo”, JSC: Autozavodska CHPP, combined cycle block (construction)
482 SO of UES, JSC: CHPP in Tarko-Sal region, combined cycle blocks ¹1,2 (construction)
483 Appendix 1. The Order of the RF Government from August 11, 2010 ¹1334 and modifications of it
484 Appendix 2. Recommendations on inputting in 2010-2030 the generating capacities at thermal power plants of Russia, declared in the Matser plan, MWt
489
Tables
:
GDP, the production of electric power and power capacity of some world countries in 2011
Generating and electric grid complexes need for capital investments for 2010–2030
Structure of the installed capacity of the electric power plants of Russia in 2002–2011, GWt
Electric power production in Russia in 2001-2011, bln kWth
Electric power balance in Russia for 2011
Dynamics forecast of production and export of electric power for 2011–2013, bln kWth
Forecast of power consumption on the UES of Russia for 2011–2017 (at the beginning of the year), bln kWth
Wearing of TPP equipment
Wearing of NPP equipment
Wearing of HPP equipment
Distributive networks of Russia that fulfilled the standard term
Dynamics of the installed capacity of electric power plants of the UES of Russia
The list of new platforms for placement of TPP of 500 MWt capacity and higher, recommended by the Master plan for construction in the period up to 2030 for basic, maximum and corrected forecasts
Forecast of dismantling the equipment at electric power plants of Russia in 2011-2030, GWt
Inputs of capacities at thermal power plants of the UES of Russia in 2011-2017, MWt
Indicators of strategic development of power industry in the period up to 2030
Cornerstone investors and the amount of investments broken down by WGC and TGC
Main indicators of investment program of power industry for 2011 (companies with the state participation in the authorized capital)
Inputs of capacity at TPP of Russia in 2011
The accomplished inputs of capacity at TPP of Russia in 2011 and the transferred ones for 2012
The number of competitions carried out by WGC and TGC in 2006-2011.
Structure of share capital of JSC “WGC-1” in 2011, %
Equipment characteristic of electric power plants of JSC “WGC-1”
Structure of fuel balance of JSC “WGC-1” in 2011, %
The electric power generation of JSC “WGC-1” plants in 2004-2011, million kWth
The heat power generation of JSC “WGC-1” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “WGC-1” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “WGC-1” for the period up to 2016 as of June 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “WGC-1” electric power plants
Structure of share capital of JSC “WGC-2” in 2011, %
Equipment characteristic of electric power plants of JSC “WGC-2”
Structure of fuel balance of JSC “WGC-2” in 2011, %
The electric power generation of JSC “WGC-2” plants in 2004-2011, million kWth
The heat power generation of JSC “WGC-2” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “WGC-2” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “WGC-2” for the period up to 2016 as of April 2012
Construction of new high-voltage lines aimed at the capacity delivery of JSC “WGC-2” electric power plants
Structure of share capital of JSC “WGC-3” in 2011, %
Equipment characteristic of electric power plants of JSC “WGC-3”
Structure of fuel balance of JSC “WGC-3” in 2011, %
The electric power generation of JSC “WGC-3” plants in 2004-2011, million kWth
The heat power generation of JSC “WGC-3” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “WGC-3” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “WGC-3” for the period up to 2019 as of April 2012
Construction of new high-voltage lines aimed at the capacity delivery of JSC “WGC-3” electric power plants
Structure of share capital of JSC “E.ON Russia” in 2011, %
Equipment characteristic of electric power plants of JSC “E.ON Russia”
Structure of fuel balance of JSC “E.ON Russia” in 2011, %
The electric power generation of JSC “E.ON Russia” plants in 2004-2011, million kWth
The heat power generation of JSC “E.ON Russia” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “E.ON Russia” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “E.ON Russia 3” for the period up to 2014 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “E.ON Russia” electric power plants
Structure of share capital of JSC “Enel WGC-5” in 2011, %
Equipment characteristic of electric power plants of JSC “Enel WGC-5”
Structure of fuel balance of JSC “Enel WGC-5” in 2011, %
The electric power generation of JSC “Enel WGC-5” plants in 2004-2011, million kWth
The heat power generation of JSC “Enel WGC-5” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Enel WGC-5” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Enel WGC-5” for the period up to 2013 as of April 2012
Construction of new high-voltage lines aimed at the capacity delivery of JSC “Enel WGC-5” electric power plants
Structure of share capital of JSC “TGC-1” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-1”
Structure of fuel balance of JSC “TGC-1” in 2011, %
The electric power generation of JSC “TGC-1” plants in 2004-2011, million kWth
The heat power generation of JSC “TGC-1” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-1” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-1” for the period up to 2016 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-1” electric power plants
Structure of share capital of JSC “TGC-2” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-2”
Structure of fuel balance of JSC “TGC-2” in 2011, %
The electric power generation of JSC “TGC-2” plants in 2004-2011, million kWth
The heat power generation of JSC “TGC-2” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-2” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-2” for the period up to 2016 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-2” electric power plants
Structure of share capital of JSC “Mosenergo” in 2011, %
Equipment characteristic of electric power plants of JSC “Mosenergo”
Structure of fuel balance of JSC “Mosenergo” in 2011, %
The electric power generation of JSC “Mosenergo” plants in 2004-2011, million kWth
The heat power generation of JSC “Mosenergo” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Mosenergo” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Mosenergo” for the period up to 2015 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “Mosenergo” electric power plants
Structure of share capital of JSC “Quadra” in 2011, %
Equipment characteristic of electric power plants of JSC “Quadra”
Structure of fuel balance of JSC “Quadra” in 2011, %
The electric power generation of JSC “Quadra” plants in 2004-2011, million kWth
The heat power generation of JSC “Quadra” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Quadra” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Quadra” for the period up to 2016 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “Quadra” electric power plants
Structure of share capital of JSC “TGC-5” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-5”
Structure of fuel balance of JSC “TGC-5” in 2011, %
The electric power generation of JSC “TGC-5” plants in 2004-2011, million kWth
The heat power generation of JSC “TGC-5” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-5” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-5” for the period up to 2015 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-5” electric power plants
“Diadema” program of CPP-Holding
Structure of share capital of JSC “TGC-6” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-6”
Structure of fuel balance of JSC “TGC-6” in 2011, %
The electric power generation of JSC “TGC-6” plants in 2004-2011, million kWth
The heat power generation of JSC “TGC-6” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-6” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-6” for the period up to 2015 as of April 2011
Structure of share capital of JSC “Volga TGC” in 2011, %
Equipment characteristic of electric power plants of JSC “Volga TGC”
Structure of fuel balance of JSC “Volga TGC” in 2011, %
The electric power generation of JSC “Volga TGC” plants in 2004-2011, million kWth
The heat power generation of JSC “Volga TGC” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Volga TGC” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Volga TGC” for the period up to 2013 as of April 2011
Facilities of technical re-equipment and reconstruction of JSC “Volga TGC” up to 2016
Structure of share capital of LLC “YuGÑ TGC-8” in 2011, %
Technical characteristics of the power-generating sector “LUKOIL”‘s plants
Structure of fuel balance of LLC “YuGÑ TGC-8” in 2008, %
The electric power generation of the power-generating sector “LUKOIL”’s companies in 2009-2011, million kWth
The heat power generation of LLC “YuGÑ TGC-8” plants in 2005-2011 thousand Gcal
Profit-and-loss report of LLC “YuGÑ TGC-8” in 2005-2011, thousand rubles (as of the period end)
Investment program of LLC “YuGÑ TGC-8” for the period up to 2013 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of LLC “YuGÑ TGC-8” electric power plants
Structure of share capital of JSC “TGC-9” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-9”
Structure of fuel balance of JSC “TGC-9” in 2010, %
The electric power generation of JSC “TGC-9” plants in 2005-2011, million kWth
The heat power generation of JSC “TGC-9” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-9” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-9” for the period up to 2017 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-9” electric power plants
Structure of share capital of JSC “Forum” in 2011, %
Equipment characteristic of electric power plants of JSC “Fortum”
Structure of fuel balance of JSC “Fortum” in 2010, %
The electric power generation of JSC “Fortum” plants in 2005-2011, million kWth
The heat power generation of JSC “Fortum” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Fortum” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Fortum” for the period up to 2015 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “Fortum” electric power plants
Structure of share capital of JSC “TGC-11” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-11”
Structure of fuel balance of JSC “TGC-11” in 2010, %
The electric power generation of JSC “TGC-11” plants in 2005-2011, million kWth
The heat power generation of JSC “TGC-11” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-11” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-11” for the period up to 2015 as of April 2011
Structure of share capital of JSC “Kuzbassenergo” in 2011, %
Equipment characteristic of electric power plants of JSC “Kuzbassenergo”
Structure of fuel balance of JSC “Kuzbassenergo” in 2010, %
The electric power generation of JSC “Kuzbassenergo” plants in 2005-2011, million kWth
The heat power generation of JSC “Kuzbassenergo” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Kuzbassenergo” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Kuzbassenergo” for the period up to 2014 as of April 2011
Structure of share capital of JSC “Yenisei TGC-13” in 2011, %
Equipment characteristic of electric power plants of JSC “Yenisei TGC-13”
Structure of fuel balance of JSC “Yenisei TGC-13” in 2010, %
The electric power generation of JSC “Yenisei TGC-13” plants in 2005-2011, million kWth
The heat power generation of JSC “Yenisei TGC-13” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Yenisei TGC-13” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Yenisei TGC-13” for the period up to 2013 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “Yenisei TGC-13” electric power plants
Structure of share capital of JSC “TGC-14” in 2011, %
Equipment characteristic of electric power plants of JSC “TGC-14”
Structure of fuel balance of JSC “TGC-14” in 2010, %
The electric power generation of JSC “TGC-14” plants in 2005-2011, million kWth
The heat power generation of JSC “TGC-14” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “TGC-14” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “TGC-14” for the period up to 2015 as of April 2011
Structure of share capital of JSC “INTER RJSC of UES” in 2011, %
Equipment characteristic of electric power plants of JSC “INTER RJSC of UES”, situated on the territory of Russia
Structure of fuel balance of JSC “INTER RJSC of UES” in 2010, %
The electric power generation of JSC “INTER RJSC of UES” plants in 2005-2011, million kWth
The heat power generation of JSC “INTER RJSC of UES” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “INTER RJSC of UES” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “INTER RJSC of UES” for the period up to 2012 as of April 2011
Construction of new high-voltage lines aimed at the capacity delivery of JSC “INTER RJSC of UES” electric power plants
Structure of share capital of JSC “Bashkirenergo” in 2011, %
Equipment characteristic of electric power plants of JSC “Bashkirenergo”
Structure of fuel balance of JSC “Bashkirenergo” in 2010, %
The electric power generation of JSC “Bashkirenergo” plants in 2005-2011, million kWth
The heat power generation of JSC “Bashkirenergo” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Bashkirenergo” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Bashkirenergo” for the period up to 2012 as of April 2011
Structure of share capital of JSC “Tatenergo” in 2011, %
Equipment characteristic of electric power plants of JSC “Tatenergo”
Structure of fuel balance of JSC “Tatenergo” in 2009, %
Performance indicators of JSC “Tatenergo” in 2006-2011, million kWth
The heat power generation of JSC “Tatenergo” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Tatenergo” in 2005-2011, thousand rubles (as of the period end)
Equipment characteristic of electric power plants of JSC “SibEco”
Structure of fuel balance of JSC “SibEco” in 2010, %
Performance indicators of JSC “SibEco” in 2006-2011, million kWth
The heat power generation of JSC “SibEco” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “SibEco” in 2005-2011, thousand rubles (as of the period end)
Structure of share capital of JSC “Irkutsenergo” in 2011, %
Characteristics of electric power plants of JSC “Irkutskenergo”
Performance indicators of JSC “Irkutskenergo” in 2006-2011, million kWth
The heat power generation of JSC “Irkutskenergo” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “Irkutskenergo” in 2005-2011, thousand rubles (as of the period end)
Investment program of JSC “Irkutskenergo” for the period up to 2020 as of April 2012
Structure of share capital of JSC “RJSC of ES of the East” in 2011, %
Characteristics of electric power plants of JSC “RJSC of ES of the East”
Structure of fuel balance of JSC “RJSC of ES of the East” in 2010, %
The electric power generation of JSC “RJSC of ES of the East” plants in 2005-2011, million kWth
The heat power generation of JSC “RJSC of ES of the East” plants in 2005-2011 thousand Gcal
Profit-and-loss report of “RJSC of ES of the East” in 2008-2011, thousand rubles (as of the period end)
Investment program of JSC “Yakutskenergo” for the period up to 2017 as of April 2012
Investment program of JSC “Sakhalinenergo” for the period up to 2015 as of April 2012
Investment program of JSC “Kamchatskenergo” for the period up to 2015 as of April 2012
Investment program of JSC “Far Eastern generating company” for the period up to 2020 as of April 2012
Diagrams
Dynamics of power consumption in Russia and GDP in 1991-2011, bln kWth
Structure of production of electric power in Russia in 2011, %
Structure of installed power capacities in Russia at the beginning of 2012, %
The installed capacities of TPP in 2010 and the forecast for 2030, GWt
The installed power capacities of Russia in 2011 and the forecast for 2030, GWt
The forecasted change of generating capacities of Russia in 2011-2030, GWt
Structure of power industry of the RF in 2011 and the amount of the necessary investments up to 2030
Dynamics of the installed capacity of the electric power plants of Russia in 1985-2011 and the forecast for 2011, GWt
Dynamics of equipment input of electric generating companies in 1951-2011, %
Structure of the installed capacity on Federal Districts considering the situation at the beginning of 2011, GWt
Structure of the installed capacity on Federal Districts considering the situation at the beginning of 2011, %
Structure of GRP on Federal Districts in 2011, %
Price forecast for electric power for industrial enterprises in Russia, Germany and the USA, euro/100 kWth
Dynamics of electric power production depending on the generation type in 2001-2011, bln kWth
Maximum loading of electric power plants of Russia in 1991-2011, GWt
Structure of power consumption on the IPS in 2011, %
Structure of power consumption on the IPS of Russia in 2017(forecast), %
Structure of power consumption on economic activity categories in 2011, %
Change of generating capacities of Russia in 1986-2011, GWt
The corrected forecast of power consumption up to 2030, bln kWth
Structure of power consumption on economic activity categories in 2030 (forecast), %
Installed capacity need up to 2030, GWt
The forecasted change of generating capacities of Russia in 2011-2030, GWt
Structure of installed power capacities in Russia at the beginning of 2012, %
Structure of installed power capacities in Russia in 2030 (forecast), %
Dynamics of generating capacities changes on generation types up to 2030, GWt
Dynamics of electric power generation by the generating companies in 2007-2011, million kWt
Electric power production with 1MWt of installed capacity for 2011, million kWth
Equipment average age of WGC, TGC and regional companies for 2011, age
Structure of the generating companies fuel balance, %
Revenue of generating companies in 2011, million rubles
Revenue rated at 1 MWt of installed capacity in 2011, million rubles
Structure of installed capacities on WGC, TGC and regional companies in 2011, %
Structure of installed capacities on WGC, TGC and regional companies in 2015-2017 (forecast), %
Structure of capacities input in companies up to 2016, %
Structure of installed capacities of WGC, TGC broken down by the cornerstone investors in 2011, %
Structure of installed capacities broken down by the cornerstone investors in 2015-2017 (forecast), %
Dynamics of the installed capacities of TPP generating companies in 2011-2016, MWt
Structure of installed capacities of WGC-1 electric power plants in 2011, MWt
Structure of power generation on WGC-1 electric power plants in 2011, %
Structure of installed capacities of WGC-1 electric power plants in 2011, %
Structure of installed capacities of WGC-1 electric power plants in 2016, %
Structure of installed capacities of WGC-2 electric power plants in 2011, MWt
Structure of power generation on WGC-2 electric power plants in 2011, %
Structure of installed capacities of WGC-2 electric power plants in 2011, %
Structure of installed capacities of WGC-2 electric power plants in 2017, %
Structure of installed capacities of WGC-3 electric power plants in 2011, MWt
Structure of power generation on WGC-3 electric power plants in 2011, %
Structure of installed capacities of WGC-3 electric power plants in 2011, %
Structure of installed capacities of WGC-3 electric power plants in 2015, %
Structure of installed capacities of E.ON Russia electric power plants in 2011, MWt
Structure of power generation on E.ON Russia electric power plants in 2011, %
Structure of installed capacities of E.ON Russia electric power plants in 2011, %
Structure of installed capacities of E.ON Russia electric power plants in 2014, %
Structure of installed capacities of Enel WGC-5 electric power plants in 2011, MWt
Structure of power generation on Enel WGC-5 electric power plants in 2011, %
Structure of installed capacities of Enel WGC-5 electric power plants in 2011, %
Structure of installed capacities of Enel WGC-5 electric power plants in 2013, %
Structure of installed capacities of TGC-1 electric power plants in 2011, MWt
Structure of power generation on TGC-1 branches in 2011, %
Structure of installed capacities of TGC-1 electric power plants in 2011, %
Structure of installed capacities of TGC-1 electric power plants in 2016, %
Structure of installed capacities of TGC-2 electric power plants in 2011, MWt
Structure of power generation on TGC-2 branches in 2011, %
Structure of installed capacities of TGC-2 electric power plants in 2011, %
Structure of installed capacities of TGC-2 electric power plants in 2016, %
Structure of installed capacities of Mosenergo electric power plants in 2011, MWt
Structure of power generation on Mosenergo electric power plants in 2011, %
Structure of installed capacities of Mosenergo electric power plants in 2011, %
Structure of installed capacities of Mosenergo electric power plants in 2011, %
Structure of installed capacities of Quadra electric power plants in 2011, MWt
Structure of power generation on Quadra electric power plants in 2011, %
Structure of installed capacities of Quadra electric power plants in 2011, %
Structure of installed capacities of Quadra electric power plants in 2016, %
Structure of installed capacities of TGC-5 electric power plants in 2011, MWt
Structure of power generation on TGC-5 branches in 2011, %
Structure of installed capacities of TGC-5 electric power plants in 2011, %
Structure of installed capacities of TGC-5 electric power plants in 2015, %
Structure of installed capacities of TGC-6 electric power plants in 2011, MWt
Structure of power generation on TGC-6 branches in 2011, %
Structure of installed capacities of TGC-6 electric power plants in 2011, %
Structure of installed capacities of TGC-6 electric power plants in 2015, %
Structure of installed capacities of TGC-7 electric power plants in 2011, MWt
Structure of power generation on TGC-7 branches in 2011, %
Structure of installed capacities of TGC-7 electric power plants in 2011, %
Structure of installed capacities of TGC-7 electric power plants in 2013, %
Structure of installed capacities of YuGC TGC-8 electric power plants in 2011, MWt
Structure of power generation on YuGC TGC-8 branches in 2011, %
Structure of installed capacities of YuGC TGC-8 electric power plants in 2011, %
Structure of installed capacities of YuGC TGC-8 electric power plants in 2014, %
Structure of installed capacities of TGC-9 electric power plants in 2011, MWt
Structure of power generation on TGC-9 branches in 2011, %
Structure of installed capacities of TGC-9 electric power plants in 2011, %
Structure of installed capacities of TGC-9 electric power plants in 2017, %
Structure of installed capacities of Fortum electric power plants in 2011, %
Structure of installed capacities of Fortum electric power plants in 2015, %
Structure of installed capacities of TGC-11 electric power plants in 2011, MWt
Structure of power generation on TGC-11 branches in 2011, %
Structure of installed capacities of TGC-11 electric power plants in 2011, %
Structure of installed capacities of TGC-11 electric power plants in 2015, %
Structure of installed capacities of Kuzbassenergo electric power plants in 2011, MWt
Structure of power generation on Kuzbassenergo branches in 2011, %
Structure of installed capacities of Kuzbassenergo electric power plants in 2011, %
Structure of installed capacities of Kuzbassenergo electric power plants in 2014, %
Structure of installed capacities of Yenisei TGC-13 electric power plants in 2011, MWt
Structure of power generation on Yenisei TGC-13 electric power plants in 2011, %
Structure of installed capacities of Yenisei TGC-13 electric power plants in 2011, %
Structure of installed capacities of Yenisei TGC-13 electric power plants in 2014, %
Structure of installed capacities of TGC-14 electric power plants in 2011, MWt
Structure of power generation on TGC-14 electric power plants in 2011, %
Structure of installed capacities of TGC-14 electric power plants in 2011, %
Structure of installed capacities of TGC-14 electric power plants in 2015, %
Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, MWt
Structure of power generation on Inter RJSC of UES electric power plants in 2011, %
Production and import-export of electric power of Inter RJSC of UES in 2004-2011, million kWth
Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, %
Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, %
Structure of installed capacities of Bashkirenergo electric power plants in 2011, MWt
Structure of power generation by Bashkirenergo 2011 ãîäó, million kWt
Structure of installed capacities of Bashkirenergo electric power plants in 2011, %
Structure of installed capacities of Bashkirenergo electric power plants in 2013, %
Structure of installed capacities of Irkutskenergo electric power plants in 2011, MWt
Structure of power generation on Irkutskenergo electric power plants in 2011, million kWth
Structure of installed capacities of Irkutskenergo electric power plants in 2011, %
Structure of installed capacities of Irkutskenergo electric power plants in 2020, %
Structure of installed capacities of RJSC of ES of the East companies in 2011, MWt
Structure of power generation by RJSC of ES of the East companies 2011, million kWth
Structure of installed capacities of Yakutskenergo in 2011, %
Structure of installed capacities of Yakutskenergo in 2017, %
Structure of installed capacities of Sakhalinenergo 2011, %
Structure of installed capacities of Sakhalinenergo 2016, %
Structure of installed capacities of Far Eastern generating company in 2011, %
Structure of installed capacities of Far Eastern generating company in 2020, %