Ñâÿæèòåñü ïðÿìî ñåé÷àñ:
+7 812 322 6848 èëè +7 495 772 7640
mail@infoline.spb.ru èëè Çàäàòü âîïðîñ
 
"Heat-Power Industry of Russia in 2011-2016  Investment projects and description of generating companies of Russia" (äîñòóïíà îáíîâëåííàÿ âåðñèÿ).

"Heat-Power Industry of Russia in 2011-2016 Investment projects and description of generating companies of Russia" (äîñòóïíà îáíîâëåííàÿ âåðñèÿ).

  • Äàòà âûõîäà : 11.09.2012
  • Êîë-âî ñòð: 507
  • ßçûê îò÷åòà: English
  • Ñòîèìîñòü: 45 000 ðóá ñî ñêèäêîé: 36 000 ðóá.
Twitter Yandex Mail Google Bookmarks Îäíîêëàññíèêè FriendFeed
Industry Profile “Heat-Power Industry of Russia in 2011-2016” – an information product within the framework of which specialists of “INFOLine” agency have prepared business-references on all the wholesale, territorial, regional generating companies, as well as a structured description of more than 100 investment projects on construction and reconstruction of thermal power plants which are actively realized at the moment. The current state, problems and prospects for further development of generating capacity of heat-power industry of Russia are analysed by the specialists of analytical agency “INFOLine”. Detailed information about WGC, TGC and regional companies (operational, financial and investment activities) is collected.
When structuring the investment projects, detailed information about its participants (contractors, designers, equipment suppliers, etc.) is collected. In the Appendix #1 the list of generating facilities is given, with the use of which the power supply under agreements for capacity supply (ACS), which in many respects defines the prospects of further development of thermal generation up to 2016, will be realized. In the Appendix #2 the recommendations about the generating capacities input at thermal power plants of Russia in 2010-2030 declared in the Master plan are provided.
The Industry Profile “Heat-Power Industry of Russia in 2011-2016” is prepared on the basis of information sources complex:
  • The official documents of the Government of Russia, the Department of Energy, the Ministry of Economic Development and Trade, the Energy Forecasting Agency, the Transmission System Operator, the Federal Tariff Service, such as:
    • Materials for the Government of the Russian Federation’s meetings concerning electric power;
    • The corrected Master plan of heat-power industry facilities placement up to 2020 with prospect up to 2030;
    • Energy Strategy of Russia for the period up to 2030;
    • Forecast of Economic Development of Russia for 2012-2014, developed by MEDT;
    • Scheme and programme of development of the UES of Russia for 2011-2017;
    • The project of Development strategy of power engineering industry for 2010-2020.
  • Reports, interview and presentations of Department of Energy of Russia’s representatives;
  • Proper materials of WGC, TGC and regional companies, including press releases, web-site materials, annual and quarterly reports, investment and purchasing programs;
  • Materials of foreign and Russian expert and analytical centers, investment companies, etc.;
  • Materials of mass media (printed press, electronic media, federal and regional news agencies);
  • Statistical data from official sources for 1991-2010, published at the moment of the research completion.
Profile Contains 2 Current state of Heat-Power Industry of Russia
8 1.1 GDP and power consumption in Russia 8 1.2 Energy efficiency of economy of Russia and the largest world countries
10 1.3 Structure of production of electric power in Russia
11 1.4 Wearing of the equipment of electric power plants
12 1.5 Prospects of power industry in Russia
16 1.6 Role of the innovations in the development of power industry
28 1.7 Main indicators of power industry in Russia
31 1.8 Cost of electric power in Russia and the developted world countries


35 Dynamics and forecast of electric power production and consumption

38 2.1 Dynamics and forecast of electric power production
38 2.2 Structure of power consumption on the IPS of Russia


40 Profile of significant events for electric power industry in 2011-2012 .

45 Consolidation of power assets of the generating companies
45 Modernization of capacities after the ACS performance
46 Governmentalization of the industry
47 Government influence on price forming processes
47 gas rates for industrial consumers and electric power plants
47 "Last mile" contracts
48 The Scheme and program of development of power industry of the Russian Federation subjects in 2011 . 48 Energy saving and increase of power efficiency for the period up to 2020 .
49 About radioactive waste management, modifications in legislation of the RF
49 Mass personnel "cleaning" in power industry
49 Prospects of the industry regulation


49 Activity of WGC, TGC and regional companies

51 3.1 Operating activities of the companies
51 3.2 Financial activity of the companies
56 3.3 Cornerstone investors of WGC and TGC
59 3.4 Investment programs of generating companies


61 "WGC-1”, JSC (INTER RJSC of UES, JSC)

68 Investment activity of JSC "WGC-1"

73 Structured description of investment projects JSC "WGC-1"


77 “WGC-1”, JSC, “TNK-BP”, JSC: Nizhnevartovsk SDPP, combined cycle block ¹3(¹3.1, ¹3.2) (construction)
77 “WGC-1”, JSC: Urengoisk SDPP, combined cycle  block ¹3 (construction)
80 “WGC-1”, JSC: Perm SDPP, combined cycle block ¹4 (construction)
82 “WGC-1”, JSC: Verkhnetagil SDPP, combined cycle block ¹12 (ñòðîèòåëüñòâî)


84 “WGC-2”, JSC (“Gasprom”, JSC)

85 Investment activity of JSC "WGC-2"

91 Structured description of investment projects JSC “WGC-2”


96 “WGC-2”, JSC: Kirishsk SDPP, combined cycle block ¹6 (reconstruction)
96 “WGC-2”, JSC: Ryazan SDPP, combined cycle block ¹2 (reconstruction)
98 “WGC-2”, JSC: Novocherkassk SDPP, combined cycle block ¹6 (construction)
99 “WGC-2”, JSC: Novocherkassk SDPP, combined cycle block ¹7 (reconstruction)
101 “WGC-2”, JSC: Cherepovets SDPP, combined cycle block ¹4 (construction)
102 “WGC-2”, JSC: Adler SDPP, combined cycle blocks ¹1, 2(construction)
104 “WGC-2”, JSC: Troitsk SDPP, coal block ¹10 (construction)
106 “WGC-2”, JSC: Stavropolsk SDPP, combined cycle blocks ¹6, 9 (construction)
109 “WGC-2”, JSC: Serovsk SDPP, combined cycle block ¹9 (construction)


111 “WGC-3”, JSC (INTER RJSC of UES, JSC)

113 Investment activity of JSC "WGC-3"

120 Structured description of investment projects JSC “WGC-3”


124 “WGC-3”, JSC: Kharanorsk SDPP, coal block ¹3 (construction)
124 “WGC-3”, JSC: Cherepetsk SDPP, coal blocks ¹8 and ¹9 (construction)
126 “WGC-3”, JSC: Yuzhnouralsk SDPP-2, combined cycle blocks ¹1-3 (construction)
129 “WGC-3”, JSC: Gusinozersk SDPP, coal block of plant ¹4 (reconstruction)
132 “WGC-3”, JSC: Dzubginsk (Tuapsinsk) TPP, gas-turbine blocks ¹1, 2 (construction)


134 “E.ON Russia”, JSC (E.On)

136 Investment activity of JSC "E.ON Russia"

141 Structured description of investment projects JSC “E.ON Russia”


144 “E.On Russia”, JSC: Yaivinsk SDPP, combined cycle block ¹5 (construction)
144 “E.On Russia”, JSC: Shatursk SDPP, combined cycle block ¹7 (construction completed)
146 “E.On Russia”, JSC: Surgut SDPP-2, combined cycle blocks ¹7,8 (construction completed)
148 “E.On Russia”, JSC: Berezovsk SDPP, coal block ¹3 (construction)


150 “Enel WGC-5, JSC (Enel)

152 Structured description of investment projects JSC “Enel WGC-5”


161 “Enel WGC-5”, JSC: Refinsk SDPP, system of dry ash and slag removal (construction)
161 “Enel WGC-5”, JSC: Refinsk SDPP, coal block ¹5 (reconstruction)
163 “Enel WGC-5”, JSC: Sredneuralsk SDPP, combined cycle block ¹12 (construction completed)
165 “Enel WGC-5”, JSC: Nevinnomyssk SDPP, combined cycle block ¹14 (construction completed)


167 TGC-1”, JSC (“Gasprom”, JSC)

169 Investment activity of JSC "TGC-1"

175 Structured description of investment projects JSC “TGC-1”


179 “TGC-1”, JSC: Pervomaisk CHPP, combined cycle blocks ¹1, 2 (construction)
179 “TGC-1”, JSC: Central CHPP, electric power plant ¹2, blocks ¹1, 2 (reconstruction)
182 “TGC-1”, JSC: Pravoberezhye CHPP-5, combined cycle block ¹2 (construction)


183 “TGC-2”, JSC (Synthesis Group)

185 Investment activity of JSC "TGC-2"

190 Structured description of investment projects JSC “TGC-2”


194 “TGC-2”, JSC: Vologda CHPP, combined cycle block (construction)
194 “TGC-2”, JSC: CHPP on the basis of Teninsk boilerhouse in Yaroslavl,combined cycle blocks ¹1,2 (construction)
196 “TGC-2”, JSC: Kostroma CHPP, power blocks ¹1, 2 (construction)
198 “TGC-2”, JSC: Novgorodsk CHPP, combined cycle block (construction)
199 “Kudepstinsk CHPP – GasElectroStroy”, LLC: Kudepstinsk CHPP, combined cycle blocks ¹1,2
(construction)

201 “Mosenergo”, JSC (“Gasprom”, JSC)

203 Investment activity of JSC "Mosenergo"

208 Structured description of investment projects JSC “Mosenergo”


212 “Mosenergo”, JSC: CHPP-9,  combined cycle block ¹10 (reconstruction)
212 “Mosenergo”, JSC: CHPP-12,  combined cycle block ¹10 (construction)
213 “Mosenergo”, JSC: CHPP-20,  combined cycle block  (construction)
214 “Mosenergo”, JSC: CHPP-16,  combined cycle block ¹8 (construction)
215 “Mosenergo”, JSC: CHPP-26,  combined cycle block ¹8 (construction completed)


217 “Quadra — Generating company”, JSC (ONEXIM Group)

219 Investment activity of JSC "Quadra"

225 Structured description of investment projects JSC “Quadra”


228 “Quadra”, JSC: Voronezh CHPP-2,  combined cycle blocks ¹1, 2 (construction completed)
228 “Quadra”, JSC: Novomoscovsk CHPP,  combined cycle block (construction)
230 “Quadra”, JSC: Lipetsk CHPP-2,  combined cycle block (construction)
232 “Quadra”, JSC: Kaluga CHPP-1,  combined cycle block (construction completed)
233 “Quadra”, JSC: Livensk CHPP,  gas-turbine unit  (construction)
235 “Quadra”, JSC: Boilerhouse of  Kurtsk’s North-West region,  combined cycle block ¹1 (construction completed)
236 “Quadra”, JSC: Dyaghilev CHPP,  combined cycle block (construction)


238 “TGC-5”, JSC (“CPP-Holding”, CJSC)

239 Investment activity of JSC "TGC-5"

244 Structured description of investment projects JSC “TGC-5”


247 “TGC-5”, JSC: Kirov CHPP-3, combined cycle block (construction)
247 “TGC-5”, JSC: Izhevsk CHPP-1, combined cycle block (construction)
249 “TGC-5”, JSC: Kirov CHPP-4, combined cycle block (reconstruction)
251 “TGC-5”, JSC: Novocheboksarovsk CHPP-3, combined cycle block (reconstruction)


252 “TGC-6”, JSC (“CPP-Holding”, CJSC)

253 Investment activity of JSC "TGC-6"

259 Structured description of investment projects JSC “TGC-6”


262 “TGC-6”, JSC: Novogorsk CHPP, combined cycle block (construction)
262 “TGC-6”, JSC: Sormovsk CHPP, turbine-generator sets of plants ¹1, 2 (reconstruction)
264 “TGC-6”, JSC: Vladimir CHPP-2, combined cycle unit (construction)


265 “Volga TGC”, JSC (“CPP-Holding”, CJSC)

267 Investment activity of JSC "Volga TGC"

272 Structured description of investment projects JSC “Volga TGC”


276 “Volga TGC”, JSC: Syzransk CHPP, combined cycle block ¹9 (construction)
276 “Volga TGC”, JSC: Novokuybyshevsk CHPP, combined cycle blocks ¹13-15 (construction)
278 “Volga TGC”, JSC: Samara SDPP, combined cycle blocks ¹11, 12 (construction)


280 Power-generating sector JSC "LUKOIL"

282 Investment activity of power-generating sector JSC "LUKOIL"

286  Structured description of investment projects of power-generating sector JSC “LUKOIL”


289 “LUKOIL”, JSC: Krasnodarsk CHPP, combined cycle block ¹5 (construction completed)
289 “LUKOIL”, JSC: Astrakhan SDPP, combined cycle block ¹5 (construction completed)
291 “LUKOIL”, JSC: “Central” boilerhouse in Astrakhan, combined cycle block ¹1 (construction)
293 “LUKOIL”, JSC: LLC “Stavrolen”, combined cycle block  (construction)


294 “TGC-9”, JSC (“CPP-Holding”, CJSC)

295 Investment activity of JSC "TGC-9"

301 Structured description of investment projects JSC “TGC-9”


305 “TGC-9”, JSC: Perm CHPP-6, combined cycle block ¹6 (construction)
305 “TGC-9”, JSC: Perm CHPP-9, combined cycle block ¹12 (construction)
307 “TGC-9”, JSC: Novobereznikovsk CHPP, combined cycle block ¹1 (construction)
309 “TGC-9”, JSC: Novo-Bogoslovsk CHPP, combined cycle block ¹1 (construction)
311 “TGC-9”, JSC: Nizhneturinsk SDPP, combined cycle blocks ¹1, 2 (construction)
313 “TGC-9”, JSC: “Academic” CHPP, combined cycle block ¹1 (construction)


314 "Fortum", JSC  (Fortum)

315 Investment activity of JSC "Fortum"

320 Structured description of investment projects JSC “Fortum”


325 “Fortum”, JSC: Nyagansk SDPP, combined cycle blocks ¹ 1-3 (construction)
325 “Fortum”, JSC: Chelyabinsk SDPP, 2 combined cycle blocks  (construction)
328 “Fortum”, JSC: Tobolsk CHPP, plant ¹3 (reconstruction completed)
329 “Fortum”, JSC: Chelyabinsk CHPP-3, combined cycle block ¹3 (construction completed)
331 “Fortum”, JSC: Tyumen CHPP-1, combined cycle block ¹2 (construction completed)


333 “TGC-11”, JSC ("INTER RJSC of UES",  JSC)

335 Investment activity of JSC "TGC-11"

341 Structured description of investment projects JSC “TGC-11”


345 “TGC-11”, JSC: Omsk CHPP-3, combined cycle block (construction)
345 “TGC-11”, JSC: Omsk CHPP-3 (reconstruction)
347 “TGC-11”, JSC: Omsk CHPP-5, plants 1, 2 (reconstruction)


349 Kuzbassenergo, JSC ("SUEK", JSC)

350 Investment activity of JSC "Kuzbassenergo"

356 Structured description of investment projects JSC “Kuzbassenergo”


360 “Kuzbassenergo” (“TGC-12”), JSC: Tom-Usinsk SDPP, plants 4, 5 (reconstruction)
360 “Kuzbassenergo” (“TGC-12”), JSC: Barnaul CHPP, gas-power block (construction)
362 “Kuzbassenergo” (“TGC-12”), JSC: Belovsk SDPP, plants 4, 6 (reconstruction)
363 “Kuzbassenergo” (“TGC-12”), JSC: Kuznetsk CHPP, power blocks ¹14-15 (construction)
364 “Kuzbassenergo” (“TGC-12”), JSC: Barnaul CHPP-2, plants 8, 9(reconstruction)


365 “Yenisei TGC (TGC-13)”, JSC (“SUEK”, JSC)

366 Investment activity of JSC "Yenisei TGC-13"

371 Structured description of investment projects JSC “Yenisei TGC-13”


374 “Yenisei TGC (TGC-13)”, JSC: Minusinsk CHPP, PT-80 turbine (reconstruction completed)
374 “Yenisei TGC (TGC-13)”, JSC: Krasnoyarsk CHPP-3, coal block ¹1 (construction completed)
375 “Yenisei TGC (TGC-13)”, JSC: Nazarovsk SDPP, coal power block ¹7(reconstruction)
377 “Yenisei TGC (TGC-13)”, JSC: Abakan CHPP, coal power block (construction)

378 “TGC-14”, JSC (LLC "Energopromsbyt")

380 Investment activity of JSC "TGC-14"

386 Structured description of investment projects JSC “TGC-14”


389 “TGC-14”, JSC: Ulan-Udensk CHPP-1,  plant 7 (reconstruction completed)
389 “TGC-14”, JSC: Ulan-Udensk CHPP-2,  coal blocks ¹1, 2 (construction)


391 “INTER RJSC of UES”, JSC (State Atomic Energy Corporation “Rosatom”)

392 Investment activity of JSC "INTER RJSC of UES"

401 Structured description of investment projects JSC “INTER RJSC of UES”


404 “INTER RJSC of UES”, JSC: Kaliningrad CHPP-2, power block ¹2 (construction completed)
404 “INTER RJSC of UES”, JSC: Ivanovsk CCGT, power block ¹2 (construction)


406 "Bahkirenergo", JSC (JSFC Sistema)

408 Investment activity of JSC "Bashkirenergo"

413 Structured description of investment projects JSC “Bashkirenergo”


416 “Bashkirenergo”, JSC: Ufimsk CHPP-2, combined cycle block (construction)
416 “Bashkirenergo”, JSC: Ufimsk CHPP-5, combined cycle blocks ¹1, 2 (construction)
418 “Bashkirenergo”, JSC: Zauralsk CHPP, combined cycle block (construction)


420 “Generating company”, JSC (Tatarstan Government)

422 Investment activity of JSC "Generating company"

426 “Irkutskenergo”, JSC (“EuroSibEnergo”, JSC)

429 Structured description of investment projects JSC “Irkutskenergo”


437 “Irkutskenergo”, JSC: Lensk TPP, combined cycle blocks ¹1,2,3 (construction)
437 “Irkutskenergo”, JSC: Bratsk mini-TPP (construction)


438 "SIBECO”, JSC (Mikhael Abyzov)

439 Investment activity of JSC "SIBECO"

444 “RJSC Eastern Energy Systems”, JSC (Federal Agency for the Administration of State Property)

447 Investment activity of JSC "RJSC of ES of the East"

453 Investment activity of JSC "Yakutskenergo"

455 Structured description of investment projects JSC “Yakutskenergo”

458 “Yakutsk”, JSC: Yakutsk SDPP-2, the first and second turns (construction)

458 Investment activity of JSC "Sakhalinenergo"

459 Structured description of investment projects JSC “Sakhalinenergo”


461 “Sakhalinenergo”, JSC: Yuzhno-Sakhalin CHPP-1, combined cycle blocks ¹4,5 (construction)
461 “Sakhalinenergo”, JSC: Yuzhno-Sakhalin SDPP-2, coal block ¹1 (construction)


463 Investment activity of JSC "Kamchatskenergo"

464 Structured description of investment projects JSC “Kamchatskenergo”


466 “Kamchatskenergo”, JSC: Kamchatsk CHPP-1, changeover of boiler units to popping of natural gas (reconstruction)

466 Investment activity of JSC "Far Eastern generating company"

467 “Far Eastern generating company”, JSC: Vladivostok CHPP-2, changeover of boiler units to popping of natural gas (reconstruction) 471 “Far Eastern generating company”, JSC: Construction of GTPP on the basis of Vladivostok CHPP-2 and CSWB (Central Steam-Water Boilerhouse)
473 “Far Eastern generating company”, JSC: Blagoveshchensk CHPP, coal block ¹4 (construction)
474 “Far Eastern generating company”, JSC: Sovgavansk CHPP, coal blocks ¹1, 2 (construction)
475 The Administration of Primorsk Region: Ussuriisk CHPP, coal power blocks ¹1,2 (construction)


477 Structured description of investment projects of other companies

478 The Government of Saint-Petersburg: the Yugo-Zapadny CHPP, combined cycle blocks ¹ 1, 2, gas-turbine block ¹3 (construction)
478 “Intertechelectro-New generation”, LLC: Kurgansk CHPP-2, combined cycle blocks ¹ 1, 2 (construction)
480 “EuroSibEnergo”, JSC: Autozavodska CHPP, combined cycle block (construction)
482 SO of UES, JSC: CHPP in Tarko-Sal region, combined cycle blocks  ¹1,2 (construction)

483 Appendix 1. The Order of the RF Government from August 11, 2010 ¹1334 and modifications of it

484 Appendix 2. Recommendations on inputting in 2010-2030 the generating capacities at thermal power plants of Russia, declared in the Matser plan, MWt

489
Tables
    :
  • GDP, the production of electric power and power capacity of some world countries in 2011
  • Generating and electric grid complexes need for capital investments for 2010–2030
  • Structure of the installed capacity of the electric power plants of Russia in 2002–2011, GWt
  • Electric power production in Russia in 2001-2011, bln kWth
  • Electric power balance in Russia for 2011
  • Dynamics forecast of production and export of electric power for 2011–2013, bln kWth
  • Forecast of power consumption on the UES of Russia for 2011–2017 (at the beginning of the year), bln kWth
  • Wearing of TPP equipment
  • Wearing of NPP equipment
  • Wearing of HPP equipment
  • Distributive networks of Russia that fulfilled the standard term
  • Dynamics of the installed capacity of electric power plants of the UES of Russia
  • The list of new platforms for placement of TPP of 500 MWt capacity and higher, recommended by the Master plan for construction in the period up to 2030 for basic, maximum and corrected forecasts
  • Forecast of dismantling the equipment at electric power plants of Russia in 2011-2030, GWt
  • Inputs of capacities at thermal power plants of the UES of Russia in 2011-2017, MWt
  • Indicators of strategic development of power industry in the period up to 2030
  • Cornerstone investors and the amount of investments broken down by WGC and TGC
  • Main indicators of investment program of power industry for 2011 (companies with the state participation in the authorized capital)
  • Inputs of capacity at TPP of Russia in 2011
  • The accomplished inputs of capacity at TPP of Russia in 2011 and the transferred ones for 2012
  • The number of competitions carried out by WGC and TGC in 2006-2011.
  • Structure of share capital of JSC “WGC-1” in 2011, %
  • Equipment characteristic of electric power plants of JSC “WGC-1”
  • Structure of fuel balance of JSC “WGC-1” in 2011, %
  • The electric power generation of JSC “WGC-1” plants in 2004-2011, million kWth
  • The heat power generation of JSC “WGC-1” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “WGC-1” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “WGC-1” for the period up to 2016 as of June 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “WGC-1” electric power plants
  • Structure of share capital of JSC “WGC-2” in 2011, %
  • Equipment characteristic of electric power plants of JSC “WGC-2”
  • Structure of fuel balance of JSC “WGC-2” in 2011, %
  • The electric power generation of JSC “WGC-2” plants in 2004-2011, million kWth
  • The heat power generation of JSC “WGC-2” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “WGC-2” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “WGC-2” for the period up to 2016 as of April 2012
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “WGC-2” electric power plants
  • Structure of share capital of JSC “WGC-3” in 2011, %
  • Equipment characteristic of electric power plants of JSC “WGC-3”
  • Structure of fuel balance of JSC “WGC-3” in 2011, %
  • The electric power generation of JSC “WGC-3” plants in 2004-2011, million kWth
  • The heat power generation of JSC “WGC-3” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “WGC-3” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “WGC-3” for the period up to 2019 as of April 2012
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “WGC-3” electric power plants
  • Structure of share capital of JSC “E.ON Russia” in 2011, %
  • Equipment characteristic of electric power plants of JSC “E.ON Russia”
  • Structure of fuel balance of JSC “E.ON Russia” in 2011, %
  • The electric power generation of JSC “E.ON Russia” plants in 2004-2011, million kWth
  • The heat power generation of JSC “E.ON Russia” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “E.ON Russia” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “E.ON Russia 3” for the period up to 2014 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “E.ON Russia” electric power plants
  • Structure of share capital of JSC “Enel WGC-5” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Enel WGC-5”
  • Structure of fuel balance of JSC “Enel WGC-5” in 2011, %
  • The electric power generation of JSC “Enel WGC-5” plants in 2004-2011, million kWth
  • The heat power generation of JSC “Enel WGC-5” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Enel WGC-5” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Enel WGC-5” for the period up to 2013 as of April 2012
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “Enel WGC-5” electric power plants
  • Structure of share capital of JSC “TGC-1” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-1”
  • Structure of fuel balance of JSC “TGC-1” in 2011, %
  • The electric power generation of JSC “TGC-1” plants in 2004-2011, million kWth
  • The heat power generation of JSC “TGC-1” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-1” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-1” for the period up to 2016 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-1” electric power plants
  • Structure of share capital of JSC “TGC-2” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-2”
  • Structure of fuel balance of JSC “TGC-2” in 2011, %
  • The electric power generation of JSC “TGC-2” plants in 2004-2011, million kWth
  • The heat power generation of JSC “TGC-2” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-2” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-2” for the period up to 2016 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-2” electric power plants
  • Structure of share capital of JSC “Mosenergo” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Mosenergo”
  • Structure of fuel balance of JSC “Mosenergo” in 2011, %
  • The electric power generation of JSC “Mosenergo” plants in 2004-2011, million kWth
  • The heat power generation of JSC “Mosenergo” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Mosenergo” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Mosenergo” for the period up to 2015 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “Mosenergo” electric power plants
  • Structure of share capital of JSC “Quadra” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Quadra”
  • Structure of fuel balance of JSC “Quadra” in 2011, %
  • The electric power generation of JSC “Quadra” plants in 2004-2011, million kWth
  • The heat power generation of JSC “Quadra” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Quadra” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Quadra” for the period up to 2016 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “Quadra” electric power plants
  • Structure of share capital of JSC “TGC-5” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-5”
  • Structure of fuel balance of JSC “TGC-5” in 2011, %
  • The electric power generation of JSC “TGC-5” plants in 2004-2011, million kWth
  • The heat power generation of JSC “TGC-5” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-5” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-5” for the period up to 2015 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-5” electric power plants
  • “Diadema” program of CPP-Holding
  • Structure of share capital of JSC “TGC-6” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-6”
  • Structure of fuel balance of JSC “TGC-6” in 2011, %
  • The electric power generation of JSC “TGC-6” plants in 2004-2011, million kWth
  • The heat power generation of JSC “TGC-6” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-6” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-6” for the period up to 2015 as of April 2011
  • Structure of share capital of JSC “Volga TGC” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Volga TGC”
  • Structure of fuel balance of JSC “Volga TGC” in 2011, %
  • The electric power generation of JSC “Volga TGC” plants in 2004-2011, million kWth
  • The heat power generation of JSC “Volga TGC” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Volga TGC” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Volga TGC” for the period up to 2013 as of April 2011
  • Facilities of technical re-equipment and reconstruction of JSC “Volga TGC” up to 2016
  • Structure of share capital of LLC “YuGÑ TGC-8” in 2011, %
  • Technical characteristics of the power-generating sector “LUKOIL”‘s plants
  • Structure of fuel balance of LLC “YuGÑ TGC-8” in 2008, %
  • The electric power generation of the power-generating sector “LUKOIL”’s companies in 2009-2011, million kWth
  • The heat power generation of LLC “YuGÑ TGC-8” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of LLC “YuGÑ TGC-8” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of LLC “YuGÑ TGC-8” for the period up to 2013 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of LLC “YuGÑ TGC-8” electric power plants
  • Structure of share capital of JSC “TGC-9” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-9”
  • Structure of fuel balance of JSC “TGC-9” in 2010, %
  • The electric power generation of JSC “TGC-9” plants in 2005-2011, million kWth
  • The heat power generation of JSC “TGC-9” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-9” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-9” for the period up to 2017 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “TGC-9” electric power plants
  • Structure of share capital of JSC “Forum” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Fortum”
  • Structure of fuel balance of JSC “Fortum” in 2010, %
  • The electric power generation of JSC “Fortum” plants in 2005-2011, million kWth
  • The heat power generation of JSC “Fortum” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Fortum” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Fortum” for the period up to 2015 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “Fortum” electric power plants
  • Structure of share capital of JSC “TGC-11” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-11”
  • Structure of fuel balance of JSC “TGC-11” in 2010, %
  • The electric power generation of JSC “TGC-11” plants in 2005-2011, million kWth
  • The heat power generation of JSC “TGC-11” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-11” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-11” for the period up to 2015 as of April 2011
  • Structure of share capital of JSC “Kuzbassenergo” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Kuzbassenergo”
  • Structure of fuel balance of JSC “Kuzbassenergo” in 2010, %
  • The electric power generation of JSC “Kuzbassenergo” plants in 2005-2011, million kWth
  • The heat power generation of JSC “Kuzbassenergo” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Kuzbassenergo” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Kuzbassenergo” for the period up to 2014 as of April 2011
  • Structure of share capital of JSC “Yenisei TGC-13” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Yenisei TGC-13”
  • Structure of fuel balance of JSC “Yenisei TGC-13” in 2010, %
  • The electric power generation of JSC “Yenisei TGC-13” plants in 2005-2011, million kWth
  • The heat power generation of JSC “Yenisei TGC-13” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Yenisei TGC-13” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Yenisei TGC-13” for the period up to 2013 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “Yenisei TGC-13” electric power plants
  • Structure of share capital of JSC “TGC-14” in 2011, %
  • Equipment characteristic of electric power plants of JSC “TGC-14”
  • Structure of fuel balance of JSC “TGC-14” in 2010, %
  • The electric power generation of JSC “TGC-14” plants in 2005-2011, million kWth
  • The heat power generation of JSC “TGC-14” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “TGC-14” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “TGC-14” for the period up to 2015 as of April 2011
  • Structure of share capital of JSC “INTER RJSC of UES” in 2011, %
  • Equipment characteristic of electric power plants of JSC “INTER RJSC of UES”, situated on the territory of Russia
  • Structure of fuel balance of JSC “INTER RJSC of UES” in 2010, %
  • The electric power generation of JSC “INTER RJSC of UES” plants in 2005-2011, million kWth
  • The heat power generation of JSC “INTER RJSC of UES” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “INTER RJSC of UES” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “INTER RJSC of UES” for the period up to 2012 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC “INTER RJSC of UES” electric power plants
  • Structure of share capital of JSC “Bashkirenergo” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Bashkirenergo”
  • Structure of fuel balance of JSC “Bashkirenergo” in 2010, %
  • The electric power generation of JSC “Bashkirenergo” plants in 2005-2011, million kWth
  • The heat power generation of JSC “Bashkirenergo” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Bashkirenergo” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Bashkirenergo” for the period up to 2012 as of April 2011
  • Structure of share capital of JSC “Tatenergo” in 2011, %
  • Equipment characteristic of electric power plants of JSC “Tatenergo”
  • Structure of fuel balance of JSC “Tatenergo” in 2009, %
  • Performance indicators of JSC “Tatenergo” in 2006-2011, million kWth
  • The heat power generation of JSC “Tatenergo” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Tatenergo” in 2005-2011, thousand rubles (as of the period end)
  • Equipment characteristic of electric power plants of JSC “SibEco”
  • Structure of fuel balance of JSC “SibEco” in 2010, %
  • Performance indicators of JSC “SibEco” in 2006-2011, million kWth
  • The heat power generation of JSC “SibEco” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “SibEco” in 2005-2011, thousand rubles (as of the period end)
  • Structure of share capital of JSC “Irkutsenergo” in 2011, %
  • Characteristics of electric power plants of JSC “Irkutskenergo”
  • Performance indicators of JSC “Irkutskenergo” in 2006-2011, million kWth
  • The heat power generation of JSC “Irkutskenergo” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “Irkutskenergo” in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Irkutskenergo” for the period up to 2020 as of April 2012
  • Structure of share capital of JSC “RJSC of ES of the East” in 2011, %
  • Characteristics of electric power plants of JSC “RJSC of ES of the East”
  • Structure of fuel balance of JSC “RJSC of ES of the East” in 2010, %
  • The electric power generation of JSC “RJSC of ES of the East” plants in 2005-2011, million kWth
  • The heat power generation of JSC “RJSC of ES of the East” plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of “RJSC of ES of the East” in 2008-2011, thousand rubles (as of the period end)
  • Investment program of JSC “Yakutskenergo” for the period up to 2017 as of April 2012
  • Investment program of JSC “Sakhalinenergo” for the period up to 2015 as of April 2012
  • Investment program of JSC “Kamchatskenergo” for the period up to 2015 as of April 2012
  • Investment program of JSC “Far Eastern generating company” for the period up to 2020 as of April 2012
Diagrams
  • Dynamics of power consumption in Russia and GDP in 1991-2011, bln kWth
  • Structure of production of electric power in Russia in 2011, %
  • Structure of installed power capacities in Russia at the beginning of 2012, %
  • The installed capacities of TPP in 2010 and the forecast for 2030, GWt
  • The installed power capacities of Russia in 2011 and the forecast for 2030, GWt
  • The forecasted change of generating capacities of Russia in 2011-2030, GWt
  • Structure of power industry of the RF in 2011 and the amount of the necessary investments up to 2030
  • Dynamics of the installed capacity of the electric power plants of Russia in 1985-2011 and the forecast for 2011, GWt
  • Dynamics of equipment input of electric generating companies in 1951-2011, %
  • Structure of the installed capacity on Federal Districts considering the situation at the beginning of 2011, GWt
  • Structure of the installed capacity on Federal Districts considering the situation at the beginning of 2011, %
  • Structure of GRP on Federal Districts in 2011, %
  • Price forecast for electric power for industrial enterprises in Russia, Germany and the USA, euro/100 kWth
  • Dynamics of electric power production depending on the generation type in 2001-2011, bln kWth
  • Maximum loading of electric power plants of Russia in 1991-2011, GWt
  • Structure of power consumption on the IPS in 2011, %
  • Structure of power consumption on the IPS of Russia in 2017(forecast), %
  • Structure of power consumption on economic activity categories in 2011, %
  • Change of generating capacities of Russia in 1986-2011, GWt
  • The corrected forecast of power consumption up to 2030, bln kWth
  • Structure of power consumption on economic activity categories in 2030 (forecast), %
  • Installed capacity need up to 2030, GWt
  • The forecasted change of generating capacities of Russia in 2011-2030, GWt
  • Structure of installed power capacities in Russia at the beginning of 2012, %
  • Structure of installed power capacities in Russia in 2030 (forecast), %
  • Dynamics of generating capacities changes on generation types up to 2030, GWt
  • Dynamics of electric power generation by the generating companies in 2007-2011, million kWt
  • Electric power production with 1MWt of installed capacity for 2011, million kWth
  • Equipment average age of WGC, TGC and regional companies for 2011, age
  • Structure of the generating companies fuel balance, %
  • Revenue of generating companies in 2011, million rubles
  • Revenue rated at 1 MWt of installed capacity in 2011, million rubles
  • Structure of installed capacities on WGC, TGC and regional companies in 2011, %
  • Structure of installed capacities on WGC, TGC and regional companies in 2015-2017 (forecast), %
  • Structure of capacities input in companies up to 2016, %
  • Structure of installed capacities of WGC, TGC broken down by the cornerstone investors in 2011, %
  • Structure of installed capacities broken down by the cornerstone investors in 2015-2017 (forecast), %
  • Dynamics of the installed capacities of TPP generating companies in 2011-2016, MWt
  • Structure of installed capacities of WGC-1 electric power plants in 2011, MWt
  • Structure of power generation on WGC-1 electric power plants in 2011, %
  • Structure of installed capacities of WGC-1 electric power plants in 2011, %
  • Structure of installed capacities of WGC-1 electric power plants in 2016, %
  • Structure of installed capacities of WGC-2 electric power plants in 2011, MWt
  • Structure of power generation on WGC-2 electric power plants in 2011, %
  • Structure of installed capacities of WGC-2 electric power plants in 2011, %
  • Structure of installed capacities of WGC-2 electric power plants in 2017, %
  • Structure of installed capacities of WGC-3 electric power plants in 2011, MWt
  • Structure of power generation on WGC-3 electric power plants in 2011, %
  • Structure of installed capacities of WGC-3 electric power plants in 2011, %
  • Structure of installed capacities of WGC-3 electric power plants in 2015, %
  • Structure of installed capacities of E.ON Russia electric power plants in 2011, MWt
  • Structure of power generation on E.ON Russia electric power plants in 2011, %
  • Structure of installed capacities of E.ON Russia electric power plants in 2011, %
  • Structure of installed capacities of E.ON Russia electric power plants in 2014, %
  • Structure of installed capacities of Enel WGC-5 electric power plants in 2011, MWt
  • Structure of power generation on Enel WGC-5 electric power plants in 2011, %
  • Structure of installed capacities of Enel WGC-5 electric power plants in 2011, %
  • Structure of installed capacities of Enel WGC-5 electric power plants in 2013, %
  • Structure of installed capacities of TGC-1 electric power plants in 2011, MWt
  • Structure of power generation on TGC-1 branches in 2011, %
  • Structure of installed capacities of TGC-1 electric power plants in 2011, %
  • Structure of installed capacities of TGC-1 electric power plants in 2016, %
  • Structure of installed capacities of TGC-2 electric power plants in 2011, MWt
  • Structure of power generation on TGC-2 branches in 2011, %
  • Structure of installed capacities of TGC-2 electric power plants in 2011, %
  • Structure of installed capacities of TGC-2 electric power plants in 2016, %
  • Structure of installed capacities of Mosenergo electric power plants in 2011, MWt
  • Structure of power generation on Mosenergo electric power plants in 2011, %
  • Structure of installed capacities of Mosenergo electric power plants in 2011, %
  • Structure of installed capacities of Mosenergo electric power plants in 2011, %
  • Structure of installed capacities of Quadra electric power plants in 2011, MWt
  • Structure of power generation on Quadra electric power plants in 2011, %
  • Structure of installed capacities of Quadra electric power plants in 2011, %
  • Structure of installed capacities of Quadra electric power plants in 2016, %
  • Structure of installed capacities of TGC-5 electric power plants in 2011, MWt
  • Structure of power generation on TGC-5 branches in 2011, %
  • Structure of installed capacities of TGC-5 electric power plants in 2011, %
  • Structure of installed capacities of TGC-5 electric power plants in 2015, %
  • Structure of installed capacities of TGC-6 electric power plants in 2011, MWt
  • Structure of power generation on TGC-6 branches in 2011, %
  • Structure of installed capacities of TGC-6 electric power plants in 2011, %
  • Structure of installed capacities of TGC-6 electric power plants in 2015, %
  • Structure of installed capacities of TGC-7 electric power plants in 2011, MWt
  • Structure of power generation on TGC-7 branches in 2011, %
  • Structure of installed capacities of TGC-7 electric power plants in 2011, %
  • Structure of installed capacities of TGC-7 electric power plants in 2013, %
  • Structure of installed capacities of YuGC TGC-8 electric power plants in 2011, MWt
  • Structure of power generation on YuGC TGC-8 branches in 2011, %
  • Structure of installed capacities of YuGC TGC-8 electric power plants in 2011, %
  • Structure of installed capacities of YuGC TGC-8 electric power plants in 2014, %
  • Structure of installed capacities of TGC-9 electric power plants in 2011, MWt
  • Structure of power generation on TGC-9 branches in 2011, %
  • Structure of installed capacities of TGC-9 electric power plants in 2011, %
  • Structure of installed capacities of TGC-9 electric power plants in 2017, %
  • Structure of installed capacities of Fortum electric power plants in 2011, %
  • Structure of installed capacities of Fortum electric power plants in 2015, %
  • Structure of installed capacities of TGC-11 electric power plants in 2011, MWt
  • Structure of power generation on TGC-11 branches in 2011, %
  • Structure of installed capacities of TGC-11 electric power plants in 2011, %
  • Structure of installed capacities of TGC-11 electric power plants in 2015, %
  • Structure of installed capacities of Kuzbassenergo electric power plants in 2011, MWt
  • Structure of power generation on Kuzbassenergo branches in 2011, %
  • Structure of installed capacities of Kuzbassenergo electric power plants in 2011, %
  • Structure of installed capacities of Kuzbassenergo electric power plants in 2014, %
  • Structure of installed capacities of Yenisei TGC-13 electric power plants in 2011, MWt
  • Structure of power generation on Yenisei TGC-13 electric power plants in 2011, %
  • Structure of installed capacities of Yenisei TGC-13 electric power plants in 2011, %
  • Structure of installed capacities of Yenisei TGC-13 electric power plants in 2014, %
  • Structure of installed capacities of TGC-14 electric power plants in 2011, MWt
  • Structure of power generation on TGC-14 electric power plants in 2011, %
  • Structure of installed capacities of TGC-14 electric power plants in 2011, %
  • Structure of installed capacities of TGC-14 electric power plants in 2015, %
  • Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, MWt
  • Structure of power generation on Inter RJSC of UES electric power plants in 2011, %
  • Production and import-export of electric power of Inter RJSC of UES in 2004-2011, million kWth
  • Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, %
  • Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, %
  • Structure of installed capacities of Bashkirenergo electric power plants in 2011, MWt
  • Structure of power generation by Bashkirenergo 2011 ãîäó, million kWt
  • Structure of installed capacities of Bashkirenergo electric power plants in 2011, %
  • Structure of installed capacities of Bashkirenergo electric power plants in 2013, %
  • Structure of installed capacities of Irkutskenergo electric power plants in 2011, MWt
  • Structure of power generation on Irkutskenergo electric power plants in 2011, million kWth
  • Structure of installed capacities of Irkutskenergo electric power plants in 2011, %
  • Structure of installed capacities of Irkutskenergo electric power plants in 2020, %
  • Structure of installed capacities of RJSC of ES of the East companies in 2011, MWt
  • Structure of power generation by RJSC of ES of the East companies 2011, million kWth
  • Structure of installed capacities of Yakutskenergo in 2011, %
  • Structure of installed capacities of Yakutskenergo in 2017, %
  • Structure of installed capacities of Sakhalinenergo 2011, %
  • Structure of installed capacities of Sakhalinenergo 2016, %
  • Structure of installed capacities of Far Eastern generating company in 2011, %
  • Structure of installed capacities of Far Eastern generating company in 2020, %

 

11.04 09:21

11.04 08:09

10.04 06:43

10.04 06:33

10.04 02:03

10.04 11:20

10.04 11:17


 
Èññëåäîâàíèÿ ðûíêîâ
Êàðòà Êîíòàêòû

Copyright © 2024: Èíôîðìàöèîííîå àãåíòñòâî “INFOLine” - ìàðêåòèíãîâûå èññëåäîâàíèÿ
Ñàíêò-Ïåòåðáóðã: +7 812 322 6848, Ìîñêâà: +7 495 772 7640
ýëåêòðîííàÿ ïî÷òà: mail@infoline.spb.ru
Àäðåñ â Ñàíêò-Ïåòåðáóðãå: 199155, Ðîññèÿ, Ñàíêò-Ïåòåðáóðã, ïð.ÊÈÌà, äîì 28
ÈÍÔÎËàéí òåë. +7(812)3226848 Ñâèäåòåëüñòâî î ðåãèñòðàöèè ÑÌÈ ÈÀ ¹ÔÑ77-37500 îò 15.09.2009 ã. Ðîñêîìíàäçîð Ìîñêâà

Ìû ïðèíèìàåì ê îïëàòå:
  


ßíäåêñ öèòèðîâàíèÿ